|
|
|
|
LEADER |
03777cam a2200661Ia 4500 |
001 |
ocn632158146 |
003 |
OCoLC |
005 |
20170419033618.0 |
006 |
m o d |
007 |
cr cn||||||||| |
008 |
100528s2010 nju ob 000 0 eng d |
040 |
|
|
|a DG1
|b eng
|e pn
|c DG1
|d IUL
|d EBLCP
|d DG1
|d OCLCQ
|d OCLCO
|d OCLCF
|d OCLCA
|d UKDOC
|d OCLCQ
|d N$T
|d YDXCP
|d E7B
|d TEFOD
|d OCLCQ
|d COO
|
019 |
|
|
|a 646788447
|a 649914203
|a 656802883
|a 683275326
|
020 |
|
|
|a 9780470912171
|
020 |
|
|
|a 0470912170
|
020 |
|
|
|a 9780470919934
|
020 |
|
|
|a 0470919930
|
020 |
|
|
|z 9780470505335
|q (cloth)
|
020 |
|
|
|z 0470505338
|
024 |
7 |
|
|a 10.1002/9780470912171
|2 doi
|
029 |
1 |
|
|a AU@
|b 000046831004
|
029 |
1 |
|
|a NZ1
|b 14698745
|
029 |
1 |
|
|a NZ1
|b 15900593
|
029 |
1 |
|
|a DEBBG
|b BV041873043
|
035 |
|
|
|a (OCoLC)632158146
|z (OCoLC)646788447
|z (OCoLC)649914203
|z (OCoLC)656802883
|z (OCoLC)683275326
|
037 |
|
|
|a 10.1002/9780470912171
|b Wiley InterScience
|n http://www3.interscience.wiley.com
|
050 |
|
4 |
|a TH438.4
|b .M83 2010
|
072 |
|
7 |
|a TEC
|x 005000
|2 bisacsh
|
082 |
0 |
4 |
|a 690.068
|2 22
|
049 |
|
|
|a MAIN
|
100 |
1 |
|
|a Mubarak, Saleh A.
|q (Saleh Altayeb)
|
245 |
1 |
0 |
|a Construction project scheduling and control /
|c Saleh Mubarak.
|
250 |
|
|
|a 2nd ed.
|
264 |
|
1 |
|a Hoboken, N.J. :
|b Wiley,
|c [2010]
|
264 |
|
4 |
|c ©2010
|
300 |
|
|
|a 1 online resource (479 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
505 |
0 |
|
|a Frontmatter -- Introduction -- Bar(Gantt)Charts -- Basic Networks -- The Critical Path Method (CPM) -- Precedence Networks -- Resource Allocation and Resource Leveling -- Schedule Updating and Project Control -- Schedule Compression and Time-Cost Trade-Off -- Reports and Presentations -- Scheduling as Part of the Project Management Effort -- Other Scheduling Methods -- Dynamic Minimum Lag Relationship -- Construction Delay and Other Claims -- Schedule Risk Management -- Appendix A: Computer Project -- Appendix B: Sample Reports -- Abbreviations -- Glossary -- References -- Bibliography -- Index.
|
504 |
|
|
|a Includes bibliographical references.
|
520 |
|
|
|a Written by a career construction professional, this text about scheduling and project lays out all steps clearly with solved and unsolved exercises that cover each subject. Computer software programs for construction are included for each chapter, along with examination of precedence networks as the realistic solution to scheduling. Also explored are new concepts in CPM scheduling such as the author's own Dynamic Minimum Lag technique. Addressing the average student, Construction Project Scheduling and Control skillfully guides readers through every aspect of a construction project, no matter.
|
588 |
0 |
|
|a Print version record.
|
650 |
|
0 |
|a Construction industry
|x Management.
|
650 |
|
0 |
|a Building
|x Superintendence.
|
650 |
|
0 |
|a Production scheduling.
|
650 |
|
4 |
|a Engineering.
|
650 |
|
4 |
|a Engineering: Construction.
|
650 |
|
7 |
|a TECHNOLOGY & ENGINEERING
|x Construction
|x General.
|2 bisacsh
|
650 |
|
7 |
|a Building
|x Superintendence.
|2 fast
|0 (OCoLC)fst00840641
|
650 |
|
7 |
|a Construction industry
|x Management.
|2 fast
|0 (OCoLC)fst00876069
|
650 |
|
7 |
|a Production scheduling.
|2 fast
|0 (OCoLC)fst01078354
|
655 |
|
4 |
|a Electronic books.
|
655 |
|
7 |
|a Electronic books.
|2 local
|
710 |
2 |
|
|a Wiley InterScience (Online service)
|
776 |
0 |
8 |
|i Print version:
|a Mubarak, Saleh A. (Saleh Altayeb).
|t Construction project scheduling and control.
|b 2nd ed.
|d Hoboken, N.J. : Wiley, ©2010
|z 9780470505335
|z 0470505338
|w (DLC) 2009045989
|w (OCoLC)470357145
|
856 |
4 |
0 |
|z View fulltext via EzAccess
|u https://ezaccess.library.uitm.edu.my/login?url=https://doi.org/10.1002/9780470912171
|
994 |
|
|
|a 92
|b DG1
|