Process management in design and construction /

Process management enables efficiency improvements by identifying and integrating generic sub-processes. This book provides a comprehensive introduction to process management in design and construction in order to meet the business needs of the construction industry as they change in a highly compet...

Full description

Bibliographic Details
Other Authors: Cooper, Rachel.
Format: eBook
Language:English
Published: Oxford, OX, UK ; Malden, MA, USA : Blackwell Pub., 2005.
Subjects:
Online Access:View fulltext via EzAccess
LEADER 05454cam a2200553Ma 4500
001 ocn608622829
003 OCoLC
005 20170124072131.1
006 m o d
007 cr cn|||||||||
008 040422s2005 enka ob 001 0 eng d
010 |z  2004046360 
040 |a MERUC  |b eng  |e pn  |c MERUC  |d E7B  |d OCLCQ  |d DG1  |d BTCTA  |d IDEBK  |d OCLCQ  |d OCLCF  |d OCLCO  |d YDXCP  |d COO  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCQ  |d DEBBG  |d AZK 
019 |a 214281952  |a 299699508  |a 646752102  |a 746573052  |a 961560555  |a 962622101 
020 |a 9780470690758 
020 |a 0470690755 
020 |a 9781405102117  |q (alk. paper) 
020 |a 140510211X  |q (alk. paper) 
020 |z 140510211X  |q (alk. paper) 
024 7 |a 10.1002/9780470690758  |2 doi 
029 1 |a DKDLA  |b 820120-katalog:000503607 
029 1 |a GBVCP  |b 644538120 
029 1 |a NZ1  |b 13340708 
029 1 |a DEBBG  |b BV043391138 
035 |a (OCoLC)608622829  |z (OCoLC)214281952  |z (OCoLC)299699508  |z (OCoLC)646752102  |z (OCoLC)746573052  |z (OCoLC)961560555  |z (OCoLC)962622101 
037 |a 10.1002/9780470690758  |b Wiley InterScience  |n http://www3.interscience.wiley.com 
050 4 |a TS171  |b .P73 2005eb 
072 7 |a KNJC  |2 bicssc 
082 0 4 |a 658.5/75  |2 22 
049 |a MAIN 
245 0 0 |a Process management in design and construction /  |c Rachel Cooper [and others]. 
264 1 |a Oxford, OX, UK ;  |a Malden, MA, USA :  |b Blackwell Pub.,  |c 2005. 
300 |a 1 online resource (xi, 192 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references (pages 148-186) and index. 
588 0 |a Print version record. 
505 0 |a Cover -- TOC36;Contents -- Preface -- Contributors -- Acknowledgements -- Introduction 45; Why Process63; -- CH36;146; The Product Development Process -- Product development in manufacturing -- The need for new product development 40;NPD41; -- NPD activities -- NPD models -- Applying product development to construction58; historical background -- Construction project process models -- Process development in construction -- Conclusion -- CH36;246; Techniques and Technologies for Managing the Product Development Process in Construction -- Approaches to process modelling -- Process improvement -- IT and the design and construction process -- Legacy archive and process information management -- Latest technology development -- Future vision -- CH36;346; Case Study58; the Generic Design and Construction Process Protocol -- What do we mean by 39;process39;63; -- Drivers behind the process -- Construction and 39;process39; -- Manufacturing and 39;process39; -- The terms of reference for designing the Process Protocol -- Factors identified with problems in the design and construction process -- The concept of the Process Protocol58; the drivers and philosophies -- Operation of the Protocol -- The Process Protocol described -- The Process Protocol elements -- The Activity zones -- Deliverables -- Legacy archive -- IT and the Process Protocol -- The use of technology during the process -- Postscript58; the development of the sub45;processes and a toolkit -- Summary -- CH36;446; Implementation Issues -- Implementation issues -- A case study of implementation58; Britannia Walk -- Communication -- The future -- Conclusion -- Appendix58; The Process Protocol Phases and Activity Zones Demystified -- Phases -- Phase 058; demonstrating the need -- Phase 158; conception of need -- Phase 258; outline feasibility -- Phase 358; substantive feasibility study and outline financial authority -- Phase 458; outline conceptual design -- Phase 558; full conceptual design -- Phase 658; production design44; procurement and full financial authority -- Phase 758; production information -- Phase 858; construction -- Phase 958; operation and maintenance -- Activity zones -- Development management -- Project management -- Resource management -- Design management -- Production management -- Facilities management -- Health and safety44; statutory and legal management -- Process management -- Change management -- List of Abbreviations -- References -- IDX36;Index -- Last Page. 
520 |a Process management enables efficiency improvements by identifying and integrating generic sub-processes. This book provides a comprehensive introduction to process management in design and construction in order to meet the business needs of the construction industry as they change in a highly competitive global environment. The book identifies the current state of the industry in the process management field, illustrates current trends and developments and demonstrates these through case study evidence. It also provides practical guidance by identifying possible pitfalls and illustrate best practice drawn from construction and appropriate manufacturing applications. 
650 0 |a Industrial design  |x Management. 
650 0 |a New products  |x Management. 
650 7 |a Industrial design  |x Management.  |2 fast  |0 (OCoLC)fst01730197 
650 7 |a New products  |x Management.  |2 fast  |0 (OCoLC)fst01036904 
655 4 |a Electronic books. 
700 1 |a Cooper, Rachel. 
776 0 8 |i Print version:  |t Process management in design and construction.  |d Oxford, OX, UK ; Malden, MA, USA : Blackwell Pub., 2005  |w (DLC) 2004046360 
856 4 0 |z View fulltext via EzAccess  |u https://ezaccess.library.uitm.edu.my/login?url=https://doi.org/10.1002/9780470690758 
994 |a 92  |b DG1