|
|
|
|
LEADER |
03265cam a2200601Ia 4500 |
001 |
ocn352789920 |
003 |
OCoLC |
005 |
20170124071633.1 |
006 |
m o d |
007 |
cr cn||||||||| |
008 |
090527s2008 enk ob 001 0 eng d |
040 |
|
|
|a DG1
|b eng
|e pn
|c DG1
|d DG1
|d OCLCA
|d OCLCQ
|d OCLCO
|d YDXCP
|d N$T
|d IDEBK
|d OCLCQ
|d DEBBG
|
019 |
|
|
|a 317698700
|a 815764300
|
020 |
|
|
|a 9781444302363
|
020 |
|
|
|a 1444302361
|
020 |
|
|
|a 9781444302370
|q (electronic bk.)
|
020 |
|
|
|a 144430237X
|q (electronic bk.)
|
020 |
|
|
|a 128200932X
|
020 |
|
|
|a 9781282009325
|
024 |
7 |
|
|a 10.1002/9781444302363
|2 doi
|
029 |
1 |
|
|a CHBIS
|b 006786777
|
029 |
1 |
|
|a CHVBK
|b 177632003
|
029 |
1 |
|
|a GBVCP
|b 790192004
|
029 |
1 |
|
|a AU@
|b 000056800164
|
029 |
1 |
|
|a DEBBG
|b BV043389623
|
035 |
|
|
|a (OCoLC)352789920
|z (OCoLC)317698700
|z (OCoLC)815764300
|
037 |
|
|
|a 10.1002/9781444302363
|b Wiley InterScience
|n http://www3.interscience.wiley.com
|
043 |
|
|
|a e-uk-en
|
050 |
|
4 |
|a KD1641
|b .B377 2008
|
072 |
|
7 |
|a LAW
|x 068000
|2 bisacsh
|
072 |
|
7 |
|a AMD
|2 bicssc
|
082 |
0 |
4 |
|a 343.42/07869
|2 22
|
049 |
|
|
|a MAIN
|
100 |
1 |
|
|a Barrett, Kevin,
|c LLB, FCIArb.
|
245 |
1 |
0 |
|a Defective construction work and the project team /
|c Kevin Barrett.
|
264 |
|
1 |
|a Oxford ;
|a Ames, Iowa :
|b Wiley-Blackwell,
|c 2008.
|
300 |
|
|
|a 1 online resource (x, 214 pages)
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
504 |
|
|
|a Includes bibliographical references (page 196) and index.
|
520 |
|
|
|a Defective construction work, whether the result of inadequate design, faulty workmanship or poor materials or some combination of these failings is a frequent cause of legal disputes. Someone is usually to blame, either the builder or one or more of the professional consultants, or even the entire project team. It is important therefore that the project team should possess a good working knowledge of their responsibilities and liabilities. Written by a solicitor with over twenty years of experience of building disputes, this book examines the responsibilities and liabilities of the project team when defects occur. It sets out the background role of the common law and statute and includes detailed discussion of important case law affecting the construction process from inception through to completion, together with a consideration of the impact of letters of intent, no contract situations, and specific provisions of model conditions of contract.
|
588 |
0 |
|
|a Print version record.
|
610 |
1 |
0 |
|a Great Britain.
|t Defective Premises Act 1972.
|
650 |
|
0 |
|a Construction contracts
|z England.
|
650 |
|
0 |
|a Liability for building accidents
|z England.
|
650 |
|
0 |
|a Premises liability
|z England.
|
650 |
|
7 |
|a LAW
|x Military.
|2 bisacsh
|
655 |
|
4 |
|a Electronic books.
|
710 |
2 |
|
|a Wiley InterScience (Online service)
|
776 |
0 |
8 |
|i Print version:
|a Barrett, Kevin, LLB, FCIArb.
|t Defective construction work and the project team.
|d Oxford ; Ames, Iowa : Wiley-Blackwell, 2008
|z 9780632059294
|z 063205929X
|w (DLC) 2008015415
|w (OCoLC)223370011
|
856 |
4 |
0 |
|z View fulltext via EzAccess
|u https://ezaccess.library.uitm.edu.my/login?url=https://doi.org/10.1002/9781444302363
|
994 |
|
|
|a 92
|b DG1
|